More About My Home Tarkshya
My Home Constructions has launched premium residential project Tarkshya, it is located in Kokapet, Hyderabad. The project will be spread on an area of 5.82 acres and is offering spacious, comfortable and beautiful 3 BHK apartments exclusively. Built-up area of 3 BHK apartments is in the range of 1957 to 2235 sq ft. Amenities available for the convenience of residents are lifts, power back-up, gymnasium, basketball court, tennis court, cricket pitch, multipurpose room, jogging track, childrens play area, intercom services, community buildings, open parking areas, open area for recreational activities, landscaping and tree planting, electrical meter room, sub-station, receiving station, fire protection, fire safety equipment, well-lit internal roads, regular supply of water, and other facilities are provided in the complex. All work related to solid waste management and disposal, treatment of sewage and sullage water, sewerage chamber, lines, septic tank, and STP are handled in the premises. Water conservation, energy management, and rainwater harvesting are done to save resources. Specifications included in the apartments are vitrified tiles flooring in living room, bedrooms, kitchen, and bathrooms, anti-skid tiles flooring in balconies, ceramic tiles dado up to lintel level in kitchen and bathroom walls, putty on interior walls, Acrylic paint on exterior walls, granite platform with stainless steel sink in the kitchen, rain shower in the bathrooms, concealed copper electric wiring with essential points, premium UPVC windows, modular electrical switches, a hardwood frame door at the entrance, and RCC framed structure. Kokapet is a comfortable area to own a residential place in Hyderabad. Many reputed schools, educational institutes, and hospitals are established here. Restaurants, banks, and other utility shops are also located in the vicinity. My Home Constructions can be contacted for owning an apartment in Tarkshya. A total number of 660 apartments were launched. The housing was launched in January 2020 and will be ready for possession by July 2023.
Show More About Project