How to participate in the Cidco lottery 2024 Janmashtami scheme?
The lottery closes on September 26, 2024.
Anuradha RamamirthamAug 2024
Cidco warns homebuyers of fraud housing schemes
Cidco has observed that misinformation about its Mass Housing Scheme is being circulated on social media platforms.
Anuradha RamamirthamAug 2024
Cidco Mass Housing Scheme lottery 2024 lucky draw on July 19
Cidco again postponed the draw that was to be held on July 16 citing technical problems.
Anuradha RamamirthamJul 2024
ED attaches Rs 113.5 crore worth properties of builder Lalit Tekchandani
Funds of over Rs 400 crore was collected by the company from 1,700 homebuyers in a housing project in Taloja.
Anuradha RamamirthamApr 2024
Cidco proposes two metro lines to improve NAINA- NMIA connectivity
Cidco is teaming up with the Urban Mass Transit Company to prepare a DPR.
Anuradha RamamirthamMar 2024
Maha CM lays foundation stone for Mumbai Metro Line 12
The project cost is around Rs 5, 865 crore and is expected to be completed by 2026-27.
Anuradha RamamirthamMar 2024
Cidco sets up booking kiosk to assist in Mass Housing Scheme Lottery 2024
The booking kiosks are set up at Taloja and Dronagiri nodes.
Anuradha RamamirthamMar 2024
Cidco Lottery 2024 to offer over 3,322 units in Navi Mumbai
The units are located in Taloja and Dronagiri.
Anuradha RamamirthamFeb 2024
Ready reckoner rates in Taloja, Navi Mumbai
Taloja is a sought-after destination in Mumbai’s thriving real estate market.
Priya BanerjeeDec 2023
Mumbai Metro Line 5: 3-km stretch to be built underground
The stretch from Dhamankar Naka to Temghar will be underground.
Anuradha RamamirthamJun 2023
CIDCO projects most registered in Taloja, Kharghar in H1FY23: Reports
While the 164 CIDCO units were registered in Kharghar, 193 CIDCO units were registered in Taloja, making the nodes top the list
Anuradha RamamirthamNov 2022
CIDCO casts 700 slabs in 555 days
With an average of 1.26 slabs per day, CIDCO completed casting of 700 slabs in 555 days in buildings in Taloja node that are under the mass housing scheme.
Anuradha RamamirthamNov 2022
CIDCO casts 500 slabs in record 489 days
These slabs have been cast in buildings in Taloja’s sector-28,29,31 and 37 that are a part of a residential complex under the Mass Housing Scheme.
Anuradha RamamirthamAug 2022