
The Bombay HC has asked the National High Speed Rail Corporation Limited and the Thane Municipal Corporation to file their replies on a stop-work notice issued to an under-construction project, whose land was reserved for the Mumbai-Ahmedabad bullet train project
PTIOct 2018

An RTI query filed with the Thane Municipal Corporation, has revealed that a total of 1,36,770 buildings in Thane, accounting for 82% of the structures, are unauthorised
PTIJun 2016

Maharashtra ready reckoner rate can be checked online and offline.
Anuradha RamamirthamApr 2025

While Solapur sees highest increase, Mumbai sees the second lowest hike in terms of ready reckoner rate in FY 2025-26.
Anuradha RamamirthamApr 2025

The Mumbai Nagpur Expressway is a modern marvel of engineering that will connect the two important cities in Maharashtra and is 99% complete.
Anuradha RamamirthamMar 2025

In addition to Jalsa, Amitabh Bachchan has invested in properties in India.
Anuradha RamamirthamMar 2025

The connectivity will be provided using Major State Highway 4 -Chinchoti-Anjur Phata Road that spreads 3,930 metre with a 40-metre right of way.
Anuradha RamamirthamJan 2025

Rustomjee group’s latest project brings 25+ luxurious amenities along with easy access to Mumbai's major social infrastructure.
Sagar SharmaAug 2024

Sheth Avalon includes 5 BHK residences spanning 2,722 sqft.
Anuradha RamamirthamJun 2024

House of Hiranandani also aspires to achieve SmartScore certification for the same building.
Dhwani MeharchandaniJun 2024

Let’s know the minimum value a property in Kolshet, Thane commands.
Anuradha RamamirthamJun 2024

Discover the minimum value that a property in Manpada, Thane can command.
Anuradha RamamirthamJun 2024

‘Breeze’ offers 500+ units in 1-2 BHK configurations.
Anuradha RamamirthamMay 2024