Samriddhi Sai Green is a residential plot by skverma36. This plot is available for sale in Lucknow District, Lucknow. This project offers plots in various sizes. The minimum plot size is 1000.0 sq.ft. and the maximum size is 12000.0 sq.ft.. This project was launched on March 2013. There are 2000 units in Samriddhi Sai Green. The address of Samriddhi Sai Green is Mohanlalganj, Lucknow.
Samriddhi Sai Green ensures a coveted lifestyle and offers a convenient living. It offers facilities such as Power Backup.
Bank loan is approved from major banks such as HDFC, LIC Housing Finance, Punjab National Bank .
Check out Samriddhi Sai Green brochure for more details.
Khujauli is well-connected to other parts of city by road, which passes through the heart of this suburb. Prominent shopping malls, movie theatres, school, and hospitals are present in proximity of this residential project.
Disclaimer: While Housing.com takes all steps to ensure accuracy of the information provided in this section, please check the same with the developers. Housing.com does not take responsibility for any discrepancies in the information provided.
Frequently Asked Questions
What is the starting price of Samriddhi Sai Green?
The price of Samriddhi Sai Green starts from Rs. 3.25 L.
What is the price range of Samriddhi Sai Green?
Samriddhi Sai Green offers Residential Plot, units. The price range of these units are as follows:- Residential Plot - From Rs. 3.25 L to Rs. 39.0 L.
What is the total size of Samriddhi Sai Green?
The total size of Samriddhi Sai Green is 100 Acres. About 0.0 Acres area of Samriddhi Sai Green is open.
Where is Samriddhi Sai Green located?
The Samriddhi Sai Green is located in Mohanlalganj, Lucknow. View all Projects in Lucknow District
What are the nearby projects to Samriddhi Sai Green?
The five data centre plots have an area ranging from 20,000 square metre (sqm) to 23,000 sqm. The plots meant for mixed-land use have an area ranging from 40,000 sqm to 91,225 sqm.
The PMAY HFA Urban was launched in June 2015 and despite initial glitches, the mission picked up pace in 2019. In this article, we track the progress of the HFA Urban in India